What ZeroCut looks like over 3 years
Every ZeroCut job finishes 19 days sooner.
26 days stick-built vs 7 with ZeroCut [4]. Five builders, one example account each, three years.
ADU builder in California: 6 to 30 a year
30 ADUs a year with the same crew
ADUs built, 3 yrs62
FBX rewards, % of ZeroCut spend, 3 yrs6.1%
Subdivision developer: 300 homes across multiple sites
300 homes in 3 years, 19 days faster each
Homes built, 3 yrs300
FBX rewards, % of ZeroCut spend, 3 yrs4.3%
Custom home builder: 2 to 10 a year
5x the homes, same core team
Homes built, 3 yrs21
FBX rewards, % of ZeroCut spend, 3 yrs6.3%
Framer scaling up to developers
From half a crew to two, with Master Crew pay
Homes installed for its clients, 3 yrs320
FBX rewards and support, 3 yrs$1.53M
Multifamily developer scaling to larger projects
84 to 189 units a year, every unit 19 days sooner
Units built, 3 yrs399
FBX rewards, % of ZeroCut spend, 3 yrs4.4%
ADU builder in California: 6 to 30 a year
30 ADUs a year with the same crew
Runs one crew building about 6 ADUs a year and wants 30 without tripling headcount. ZeroCut sets a 1,150 sq ft ADU shell in about a crew-day and takes 19 days off every schedule [4]. Reaches Pro in year 2 and Elite in year 3.
One example account, illustrative.
| Metric | Year 1 | Year 2 | Year 3 | 3-year total |
|---|---|---|---|---|
| ADUs built | 12 | 20 | 30 | 62 |
| Installed sq ft | 13,800 sq ft | 23,000 sq ft | 34,500 sq ft | 71,300 sq ft |
| Buyer tier at year end | Certified | Pro | Elite | — |
| Schedule days saved | 228 | 380 | 570 | 1,178 |
| FBX rewards, % of ZeroCut spend | 5.3% | 5.2% | 7.1% | 6.1% |
| ZeroCut package pricing | Sign in to see pricing | |||
Subdivision developer: 300 homes across multiple sites
300 homes in 3 years, 19 days faster each
ZeroCut replaces his traditional volume of about 63 homes in year 1, at the US median new-home size of 2,142 sq ft [2], then grows 1.5x a year. One community sells about 2.4–2.6 homes a month [3], so this pace means several sites at once. His framing crews are certified ZeroCut installers.
One example account, illustrative.
| Metric | Year 1 | Year 2 | Year 3 | 3-year total |
|---|---|---|---|---|
| Homes built | 63 | 95 | 142 | 300 |
| Installed sq ft | 134,946 sq ft | 203,490 sq ft | 304,164 sq ft | 642,600 sq ft |
| Schedule days saved | 1,197 | 1,805 | 2,698 | 5,700 |
| Construction carry saved ($90/home/day) [4] | $108K | $162K | $243K | $513K |
| FBX rewards, % of ZeroCut spend | 4.4% | 4.3% | 4.3% | 4.3% |
| ZeroCut package pricing | Sign in to see pricing | |||
Custom home builder: 2 to 10 a year
5x the homes, same core team
Builds 2 large custom homes a year and wants 10 with the same core team. Each 3,000 sq ft home counts as 2 home-equivalents, so the builder reaches Pro in year 2 and Elite in year 3, which unlocks the extended ZeroCut warranty.
One example account, illustrative.
| Metric | Year 1 | Year 2 | Year 3 | 3-year total |
|---|---|---|---|---|
| Homes built | 4 | 7 | 10 | 21 |
| Installed sq ft | 12,000 sq ft | 21,000 sq ft | 30,000 sq ft | 63,000 sq ft |
| Buyer tier at year end | Certified | Pro | Elite | — |
| Schedule days saved | 76 | 133 | 190 | 399 |
| FBX rewards, % of ZeroCut spend | 7.3% | 5.0% | 6.9% | 6.3% |
| ZeroCut package pricing | Sign in to see pricing | |||
Framer scaling up to developers
From half a crew to two, with Master Crew pay
A framing sub that sets ZeroCut panels for GCs and developers and takes routed FBX crew work at 70% of the FBX crew price. Every square foot it sets earns an installer credit that rises with its tier. Reaches Lead Installer in year 1 and Master Crew in year 2.
One example account, illustrative.
| Metric | Year 1 | Year 2 | Year 3 | 3-year total |
|---|---|---|---|---|
| Homes installed for its clients | 40 | 100 | 180 | 320 |
| Routed FBX crew work (sq ft) | 0 sq ft | 30,000 sq ft | 60,000 sq ft | 90,000 sq ft |
| Total sq ft set | 70,000 sq ft | 205,000 sq ft | 375,000 sq ft | 650,000 sq ft |
| Installer tier at year end | Lead Installer | Master Crew | Master Crew | — |
| Install revenue | $210K | $605K | $1.1M | $1.92M |
| Schedule days saved for clients | 760 | 1,900 | 3,420 | 6,080 |
| Installer credit | $37K | $167K | $338K | $541K |
| Installer profit-pool share (estimate) | $103K | $249K | $243K | $595K |
| Recruit override | $40K | $118K | $216K | $374K |
| FBX rewards and support | $192K | $538K | $802K | $1.53M |
| ZeroCut package pricing | Sign in to see pricing | |||
Multifamily developer scaling to larger projects
84 to 189 units a year, every unit 19 days sooner
ZeroCut replaces the typical multifamily builder's volume of 84 units [1] in year 1, then grows 1.5x a year across sites and larger 3-story buildings. Units are 1,000 sq ft, the US median for new rentals [2]. Pairs with Lesso bathroom cores.
One example account, illustrative.
| Metric | Year 1 | Year 2 | Year 3 | 3-year total |
|---|---|---|---|---|
| Units built | 84 | 126 | 189 | 399 |
| Installed sq ft | 84,000 sq ft | 126,000 sq ft | 189,000 sq ft | 399,000 sq ft |
| Schedule days saved | 1,596 | 2,394 | 3,591 | 7,581 |
| Construction carry saved ($60/unit/day) [4] | $96K | $144K | $215K | $455K |
| FBX rewards, % of ZeroCut spend | 4.5% | 4.4% | 4.3% | 4.4% |
| ZeroCut package pricing | Sign in to see pricing | |||
Tiers
How tiers work by home size
Tiers are earned on installed square feet over a rolling 12 months: Pro at 18,000 sq ft, Elite at 27,000 sq ft. One ZeroCut package covers walls, roof deck and cores.
These examples use installed square feet to model tier progression. Builder Network terms currently list installed homes; final qualification terms are confirmed at onboarding.
| Home size | Project type | Homes/yr to reach Pro | Homes/yr to reach Elite |
|---|---|---|---|
| 600 sq ft | Small ADU / studio unit | 30 | 45 |
| 1,150 sq ft | ADU | 16 | 24 |
| 1,000 sq ft | Apartment unit (US median rental, 2025) | 18 | 27 |
| 1,350 sq ft | Small home / townhome | 14 | 20 |
| 1,750 sq ft | Typical single-family | 11 | 16 |
| 1,900 sq ft | Starter single-family | 10 | 15 |
| 2,142 sq ft | Production single-family (US median, 2025) | 9 | 13 |
| 2,500 sq ft | Move-up single-family | 8 | 11 |
| 3,000 sq ft | Custom home | 6 | 9 |
| 4,000 sq ft | Large custom home | 5 | 7 |
Sources
- [1] NAHB, multifamily builder members: median 84 starts (2021); 2023 averages 37.3 single-family / 21.9 multifamily Link 1 Link 2
- [2] US Census Bureau, Characteristics of New Housing 2025: median new single-family home 2,142 sq ft; median new rental unit 1,000 sq ft Link
- [3] PulteGroup Q2 2025 earnings call: 2.4 homes per community per month (2.6 pre-COVID) Link
- [4] FBX estimates: 26-day stick-built shell schedule vs 7 days with ZeroCut; carry cost per day; crew productivity
Scenarios are illustrative, built on FBX planning assumptions. They are not a quote, offer or guarantee. Program terms are proposed and may change. Reward credits expire 12 months after they are earned.